Egypt’s President Sisi warns of expanding ongoing war on Gaza regionally (Oct 02, 2024)   |   Nabil Elaraby, Egypt’s Negotiator of Camp David Peace Conference and Taba Summit dies at 89 (Oct 02, 2024)   |   Egypt, Jordan condemn Ben-Gvir’s comments on building synagogue in Al Aqsa Mosque (Oct 02, 2024)   |   Egyptian Cabinet approves Emirati company Masdar 4GW solar station project (Oct 02, 2024)   |   InvestMin meets General Electric Healthcare's delegation to boost investments (Oct 02, 2024)   |  

Products

Home Products

Tunnel portal

Tunnel portal

Geofrost provides stabilization by freezing so tunnel excavation can start directly in the soils outside the rock, minimizing environmental footprint. The freezing pipes are installed from the surface into the rock where normal tunnel excavation can continue. Issues avoided:

  • Impacting landscape and natural groundwater levels.
  • Removal of buildings in affected zone.
  • Slope stability problems.
  • Excavation of large volumes that need to be transported, deposited and potentially brought back and laid out on top of the cut and cover portal.
  • Rerouting of roads and other infrastructure crossing the area.
Our website 

Availability: In Stock

Attachments

No attachments available.


Factory:Other

City City A Found Date 2024-09-30
License Number