Egypt’s President Sisi warns of expanding ongoing war on Gaza regionally (Oct 02, 2024)   |   Nabil Elaraby, Egypt’s Negotiator of Camp David Peace Conference and Taba Summit dies at 89 (Oct 02, 2024)   |   Egypt, Jordan condemn Ben-Gvir’s comments on building synagogue in Al Aqsa Mosque (Oct 02, 2024)   |   Egyptian Cabinet approves Emirati company Masdar 4GW solar station project (Oct 02, 2024)   |   InvestMin meets General Electric Healthcare's delegation to boost investments (Oct 02, 2024)   |  

Products

Home Products

Inadequate rock cover

Inadequate rock cover

Geofrost provides ground improvement above the rock surface which can be established from the tunnel face or from the ground surface. The soils are frozen to a strong and impermeable temporary supporting structure. By freezing from ground surface the tunnel excavation can continue without stop, either by traditional drilling and blasting or by tunnel bore machine. We install freezing pipes around the whole tunnel, or part of the tunnel circumference, depending on the situation. Often the whole circumference must be frozen when sealing against water ingress or pore pressure reduction. In cases of local support against break in of blocks or poor ground it may be sufficient to freeze a smaller arch, for example above the crown or on one side. Our website 

Availability: In Stock

Attachments

No attachments available.


Factory:Other

City City A Found Date 2024-09-30
License Number